MAC Meeting 30 April 2025

https://indico.cern.ch/event/1542594/

Hexaboards

  • 530 / 600 LD boards (w/v3c) passed the QC
  • Dead 1/2 chips !!!
  • ~170 coming soon. Will go through FNAL

Alethea

  • Bonding notes:
  • Encapsulant level should not exceed the top of the hexaboard • Look at the module from the side, there should be no dome of encapsulant
  • Backside bonds: • More is better

Rong-Shang

  • Numbers dont add b/c not all modules have been tested

Bora:

  • Nice pictures for [BROKEN LINK: HGC Slides for April 2023 Review]

Baseplates

  • Leave May 40 Ti LD Full / 72 to UCSB (12 of each partial type Ti)

Engineering Report (Susanne)

  • Final order (Partials Hexaboard PUTs from Xometry) were delivered 4/23
  • Ordering transfer tape
  • Determination of module placement specs
  • Spare parts for MACS

UCSB Status

12 HD Ti modules for cassettes 3 HD "No tape test" Studies on binding the wrong cell

Follow-ups